Skip to main content
24/7 emergency service available
Three-Phase Supply Upgrade
Supply upgrade

Three-Phase Supply Upgrade

A three-phase supply gives your home or business substantially more available power. We rebuild the consumer unit, balance the circuits across the phases and handle the application and coordination with your grid operator.

Our work quoted separately from the grid operator fee

Request a free quote

When do you need three phases?

A single-phase Dutch connection is usually rated at 1x35A, roughly 8 kW. That was ample for a gas-heated home. It is not enough once you add several of the following:

  • An EV charger of 11 kW or more
  • A heat pump
  • An induction hob and an electric oven
  • Solar panels with a large inverter
  • Workshop machinery or catering equipment

Upgrade or rebalance?

Not every overload needs a bigger supply. Sometimes the existing capacity is simply distributed badly across the phases, with everything heavy on one of them. We measure first. If rebalancing solves it, we tell you so — it is considerably cheaper than an upgrade.

What determines the price

  • Your current supply and what it is being upgraded to
  • The grid operator’s charge, which is set by them, not by us
  • Whether the consumer unit has to be rebuilt or replaced
  • The number of circuits to be redistributed

Our quote separates our own work from the grid operator’s fee, so you can see exactly what you are paying for.

Three-phase power for businesses

Workshops, kitchens and small industrial units almost always need three phases. We work outside opening hours where required so production or service is not interrupted.

Need Three-Phase Supply Upgrade? Call us now: 085 505 5457

Contact Us
Frequently asked questions

Frequently asked questions about three phase supply

What does a three-phase upgrade cost?

Two amounts: our installation work, quoted at a fixed price, and the grid operator's connection charge, which is a published tariff. We set both out separately.

How long does it take?

Our own work is typically one day. The grid operator normally needs several weeks to schedule, so allow for that lead time.

Do I really need three phases?

Not always. We measure your actual load first — rebalancing the existing phases is often enough and costs far less.

Who submits the application?

We do. We handle the application to the grid operator and coordinate the appointment.

Will my energy bill go up?

The standing charge for the connection rises. Your consumption does not change simply because more capacity is available.

Request a quote

Request a quote, with no obligation

Tell us briefly what you need. You will receive a clear quotation within 24 hours, with no surprises afterwards. For emergencies, call us directly on 085 505 5457.

✓ Nationwide service  |  ✓ Available 24/7  |  ✓ NEN-certified  |  ✓ Transparent pricing

Request a free quote

More services

See our other electrical services

Sockets & Lighting

Everyday work

Sockets & Lighting

Extra sockets, single to double conversions, new switches or lighting installation. Large or small, we handle it quickly and properly.

More Information

Three-Phase Supply Upgrade in uw stad